5Wiese J, Simon J, Steinmetz H. A process-dependent real-time controller for sequencing batch reactor plants: results of full-scale operation[J]. Wat Sci Tech.,2006,53(4-5): 143 - 150.
6Langergraber G, Gupta J, Pressl A, et al. On-line monitoring for control of a pilot-scale sequencing batch reactorusing a submersiber UV/VIS spectrometer[J].Wat Sci Tech.,2004,50(10):73-80.
7Buitron G, Shoeb M, Moreno A. Evaluation of two control strate- gies for a sequencing batch reactor degrading high concentration peaks of 4-chlorophenol[J].Water Research,2005,39(6): 1015-1024.
8CaseUas M, Dagot C, Baudu M. Set up and assessment of a control strategy in a SBR in order to enhance nitrogen and phosphorus removal[J]. Process Biochemistry,2006,41 (9): 1994-2001.
9Li B, Irvin S. The comparison of alkalinity and ORP as indicators for nitrification and denitrification in a sequencing batch reactor (SBR) [J]. Biochemical Engineering Journal, 2007, 34(3): 248-255.
10Wang Y, Peng Y, Peng C, et al. Influence of ORP variation, carbon source and nitrate concentration on denitrifying phosphorus removal by DPB sludge from dephanox process [J].Wat Sci Tech., 2004,50(10):153-161.