摘要
水电移民搬迁安置活动涉及多方利益相关者,利益关系复杂,风险程度较高。水电移民整体风险组成中,政府风险是水电移民风险的一个重要组成部分。基于PSR方法原理,对于水电移民工作中的政府风险的环境压力、管理状态进行了分析,对于移民政策调整、府际关系恶化、政府能力遭到质疑、社会秩序失稳、经济发展停滞、政府调节经济失灵、水电开发决策失误、移民安置决策失误、移民影响区环境恶化以及道德等风险进行了解读。
hydropower migration allocation activities involve many stakeholders with complex interest relationship and high degree of risk. In hydropower migration overall risk composition, the government risk is an important component in hydropower immigration risk. Based on the principle of PSR methods, the environmental pressure and management state of government risk in hydropower immigration work were analyzed, the immigration policy adjustment, government relations deteriorating, government ability questioning, social order instability, economic development stagnation, government regulation economic failure, hydropower development decision error, resettlement decision error, immigration influence area deterioration of the environment and the moral, and other risks were unscrambled.
出处
《中国水能及电气化》
2012年第5期10-17,共8页
China Water Power & Electrification
基金
江西省高校人文社科资助项目(0131)
江西省高校人文社会科学重点研究基地
江西农业大学三农问题研究中心资助项目(JD1140)
关键词
水电移民
政府风险
环境压力
管理状态
hydropower immigrants
government risk
environmental pressure
management state