谈连续刚构桥控制长期下挠的措施

Discussion on measures of controlling long-term deflection of continuous steel bridge
在线阅读 下载PDF
导出
摘要 结合多年的工程实践经验,提出通过跨中对顶合龙张拉下缘预应力索进行体系转换、通过体外索和跨中预压重等措施控制连续刚构桥长期下挠,解决了控制大跨梁桥长期下挠的难题,保证了结构的安全。 Combining with many years’experience,the paper puts forward some measures of controlling long-term deflection of continuous steel bridge,such as carrying out system conversion by middle-span and opposite-vertex fold and pulling upward prestress cable,and external cable and middle-span preloading weight and so on.As a result,it solves the long-term deflection of large-span beam steel bridge and guarantees the structural safety.
作者 郭永平
出处 《山西建筑》 2012年第15期169-171,共3页 Shanxi Architecture
关键词 连续刚构桥 长期下挠 跨中对顶合龙 体外预应力索 continuous steel bridge long-term deflection middle-span and opposite-vertex fold external prestress cable
  • 相关文献

参考文献5

二级参考文献26

  • 1刘超英.无粘结部分预应力矩形截面受弯构件短期刚度的试验研究[J].土木工程学报,1988,21(8):37-46.
  • 2杜进生 刘西拉.体外预应力加固钢筋混凝土连续梁、框架梁的试验报告[R].清华大学土木工程系,1999年7月..
  • 3文明秀 赵国藩.无粘结部分预应力混凝土梁极限抗弯强度的试验研究[A]..1989年桥梁学术会议论文集[C].,..
  • 4刘健行 张曙.无粘结部分预应力混凝土梁的极限强度、裂缝和变形的试验研究[J].湖南大学学报,1987,14(3):2-11.
  • 5Edward G Nawy. Prestressed concrete. Mc-Graw Hill,N Y,1989. 22~51
  • 6Dezi L, leoni G, Tarantino A M. Algebraic methods for creep analysis of continuous composite beams. Journal of Structure Engineering,1996,122(4):423~430
  • 7Nasreddin EL-Mezaini. Finite element analysis of prestressed and reinforced concrete structures. Jour nal of Structure Engineering,1998(5):551~559
  • 8李传习,夏桂云.大跨度桥梁结构计算理论.北京:人民交通出版社,2002.36-69
  • 9Baker, A L L. Plastic theory of design for ordinary reinforced and prestressed conctrete including moment redistribution in continuous members [J]. Magazine of concrete research,1949, 1 (2) : 57 - 66.
  • 10Naaman A E and Alkhairi F M. Stress at ultimate in unbonded post- tensioning tendons: Part2 - Proposed methodology [J]. ACI Structural Journal, 1991, 88 (6): 683 - 692.

共引文献4401

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部