摘要
针对布仑口—公格尔水电站深斜竖井的导洞开挖过程中难以实现仪器全程控制其轴线的情况,预先在已开挖导洞顶部轴线的投影位置上确定三个悬垂线点位,通过悬垂线标定中轴线,使用激光束指导开挖方向,控制导洞的施工,完成了导洞的贯通。实践证明该方法在深斜竖井的施工中具有一定的实用价值。
In allusion to the situation difficult to control the axis with instrument during the excavation for the pilot well of the deep inclined shaft in Bulunkou-Kongur Hydropower Station,it is suggested here that through laying out three hanging wire points in advance to determine the axis of the pilot well,and using laser beam to guide the excavation direction and control the construction of the pilot well,the breakthrough of the pilot well could be completed.It is proved by practices that this method has a certain practical value in the construction of deep inclined shaft.
出处
《水利与建筑工程学报》
2012年第2期1-3,共3页
Journal of Water Resources and Architectural Engineering
基金
国家高等学校博士点专项科研基金资助课题(200807580007)
新疆水利水电工程重点学科资助项目(XJZDXK-2002-10-05)
关键词
深斜竖井
导洞
轴线
横断面
施工控制
deep inclined shaft
pilot well
axis
cross-section
construction control