摘要
分析了多人合作对策中的费用分摊问题 ,总结了求解费用分摊问题中的几种有效解法 ,并就某矿业集团合作兴建大型水处理厂这一实际问题 ,采用核心法 ( N ucleolus法 )、简化的 MCRS法、GQP法和 Shapley值法等四种方法分别进行了计算 。
This paper analyzes the cost allocation problem of \$n\$\|person cooperation game. It concludes several effective solutions for cost allocation problem. For a practical problem of several coal mines in a mining group building a big water treatment factory jointly, four methods are used and compared, the nucleolus method, simplified MCRS (minimum cost\|remaining savings), game quadratic programming method and Sharpley value method are used to do the calculation work and analyze the different scopes and conditions of these methods.
出处
《系统工程理论与实践》
EI
CSCD
北大核心
2000年第3期116-119,144,共5页
Systems Engineering-Theory & Practice