基于FMEA的金川龙首矿充填系统失效风险模糊评估 被引量:5

Fuzzy Evaluation of Failure Risk for Filling System of Longshou Mine in Jinchuan Based on FMEA
原文传递
导出
摘要 运用FMEA的原理,建立金川龙首矿充填系统失效风险评价模型。引入层次分析法与模糊综合评判方法,综合考虑子系统间的相互作用,并对其对进行定性和定量地分析,最终找到充填系统的薄弱环节。结果表明:在金川龙首矿充填系统的三大系统中,制浆系统与管道输送系统的失效概率较大;在子系统中,搅拌系统、立式砂仓、管道输送系统(竖直管道、水平管道)和充填挡墙更容易失效。 Based on principles of the FMEA(failure modes and effect analysis),the failure risk assessment model of the filling system of Longshou Mine in Jinchuan was established.This thesis employed the analytic hierarchy process and the fuzzy comprehensive judgement method.The interaction of subsystems was comprehensively considered,which was analysed qualitatively and quantitatively.Finally,the weak links in the filling system was found.Major findings are as follows: among the three systems of the filling system of Longshou Mine in Jinchuan,the pulping system and the transportation system have a higher failure probability;among the subsystems,the mixing system,the vertical sand tank,the pipeline transportation system(vertical pipe and horizontal pipe) and the filling retaining wall are more likely to fail.
出处 《武汉理工大学学报》 CAS CSCD 北大核心 2012年第3期115-119,共5页 Journal of Wuhan University of Technology
基金 "十一五"国家科技支撑计划(2008BAB32B03)
关键词 充填系统 FMEA 层次分析法 隶属函数 模糊综合评判 filling system failure modes and effect analysis AHP membership function fuzzy comprehensive evaluation
  • 相关文献

参考文献10

二级参考文献61

共引文献483

同被引文献65

引证文献5

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部