摘要
本文阐述了西洱河电厂四级3号机组增容改造的原因和条件,以及A553新转轮的性能和模型转轮的试验情况。
In this paper, the reasons and conditions of rehabilitation of unit 3 of classes 4 for Xierhe hydro power plant were expounded, the performance of new runner A553 and the test cases of model runner were introduced. And the processes of rehabilitation and test cases after rehabilitation were introduced.
出处
《大电机技术》
北大核心
2000年第1期54-57,共4页
Large Electric Machine and Hydraulic Turbine