龙头山金矿选冶工艺技术改造与生产实践

Reform and operation practice of the technology of ore dressing and smelting in Longtoushan Gold Mine
在线阅读 下载PDF
导出
摘要 针对龙头山金矿选冶工艺流程存在的问题,为提高回收率和处理能力对原流程进行了技术改造。技改后的工艺流程适宜矿石性质,畅通稳定,选矿回收率由技改前的87-55%提高到92-15%,处理能力由原设计的100t/d提高到200t/d,选冶成本由技改前145-54元/t降低到105-70元/t,较技改前累计取得了742-66万元的显著经济效益。 The reforms of the original process flow of ore dressing and smelting in Longtoushan Gold Mine were made in order to overcome the problems in it and improve its treatment capacity.It showed that the reformed process flow was unblocked.stable and adaptable to ore property.As a result,the recovery rate of ore dressing improved from 88.55% to 93.16%,the treatment capacity improved from 100t/d of design to 200t/d,the unit treatment cost decreased from $145.54 to $105.90 and the accumutative total of economic benefit reached $7.4266 millions.
出处 《黄金》 CAS 北大核心 2000年第2期36-40,共5页 Gold
关键词 技术改造 生产实践 金矿 选矿 冶金 technical reform operation practice recovery rate treatment capacity econemic benefit
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部