摘要
对铜街子水电站2号发电机定子铁芯松动、波浪度增大的原因做了分析,并说明了检修处理的方法。
The reasons of loose stator core and increased wave of the second machine in Tongjiezi Hydropower Station are analyzed and the repair methods are described.
出处
《水电与新能源》
2012年第2期66-67,共2页
Hydropower and New Energy