期刊文献+

磨子潭双支墩大头坝垂直位移监测资料分析 被引量:1

Observation Data Analysis of Vertical Displacement of Mozitan Massive-head Double Buttress Dam
在线阅读 下载PDF
导出
摘要 为准确地分析双支墩大头坝垂直位移变化规律,在建立坝体垂直位移统计模型时,采用温度周期项、气温实测值和混凝土温实测值对于温度分量进行建模,并对模型进行对比分析。结果表明:采用混凝土温实测值建立的模型的计算结果和实测值拟合较好,能更好地反映出大坝垂直位移变化规律。 In order to analyze more accurately tress dam, the temperature component should the changing rules of vertical displacement of massive - head double butbe considered from the temperature periodic item, the temperature measured data and the measured concrete temperature when building the statistical model and the models are comparatively analyzed. The results indicate that the calculation result of the model built by the measured concrete temperature fits the measured data better and can better reflect the changing rules of the dam vertical displacement.
出处 《水电与新能源》 2012年第2期58-60,共3页 Hydropower and New Energy
关键词 双支墩大头坝 垂直位移 统计模型 温度分量 混凝土温实测值 Massive-head double buttress dam vertical displacement statistical model temperature component measured concrete temperature
  • 相关文献

参考文献2

二级参考文献9

共引文献15

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部