期刊文献+

隧道洞口滑坡加固方案数值模拟研究 被引量:4

Study on Reinforcement of Tunnel Portal Slope by Numerical Simulation
在线阅读 下载PDF
导出
摘要 基于武罐高速公路楼房山隧道洞口滑坡,提出先高压注浆加固,稳定局部边坡,再通过有限差分软件Flac3D对普通抗滑桩和预应力锚索抗滑桩这两种支挡措施进行数值计算分析,对比施加支挡后的坡体变形量、桩身剪力及弯矩的合理分布,得出预应力锚索抗滑桩比普通抗滑桩受力更合理,可使桩的截面尺寸等的设计更加经济. According to Loufangshan tunnel entrance landslide of Wudu-Guanzigou Expressway,the first high-pressure grouting is presented to firm the local slope,then the retaining structure of anti-slide piles with and without prestressed cables is simulated by Flac3D.The results including slope deformation,shearing force and bending moment distribution along pile shaft are compared.The comparison of numerical simulation indicated that the way of load bearing of anti-slide piles with prestressed cables is more reasonable,so the dimensions of the pile sections can be designed more economically.
出处 《兰州交通大学学报》 CAS 2012年第1期57-60,64,共5页 Journal of Lanzhou Jiaotong University
关键词 隧道洞口 滑坡 高压注浆 抗滑桩 FLAC3D tunnel entrance landslide high-pressure grouting anti-slide piles Flac3D
  • 相关文献

参考文献3

二级参考文献26

共引文献106

同被引文献54

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部