期刊文献+

GPS在长输管道同沟光缆施工中的应用 被引量:3

Application of GPS in Laying Canble and Pipeline into the Same Ditch
在线阅读 下载PDF
导出
摘要 近年来,油气田光缆施工大多采用与长输管道同沟敷设方式,但因征地、跨越农田地段和穿越等复杂多变环境,管道施工经常采用跳跃式施工,光缆自然不可能实现按顺序连续敷设。采用传统测量方式,耗时、效率低、误差大。如采用GPS测量方式,既能达到精确配盘保证施工质量,又能减轻劳动强度、减少作业时间,同时节省材料降低施工成本,且形成的数字化资料对用户今后光缆巡线、抢修和维护也都十分方便。 In recent years, the fiber cable construction in the oil and gas fields always use the way of laying the cable and the long-distance pipeline into the same ditch which may set underground. For the reason of land acquisition and the complex environments in construc- tion sites, the cable can not be continuous set in order because of the pipeline can not be set successively during constrction. Using the traditional measurement, it may has the shortage of time-consuming, inefficient and large error. The GPS measurement can take precise ar- rangements, quickly examining the location of joint pit, reducing construction time, saving material and construction cost. The circuit stick's numbers and the joint pit coordinates can give lots of help to the cable's tour-line,repair, and maintenance.
作者 徐向阳 岳庆
出处 《全球定位系统》 2012年第1期81-83,共3页 Gnss World of China
关键词 同沟 光缆施工 GPS测量 施工成本 Pipeline in the same ditch cable construction GPS measurement construction cost
  • 相关文献

参考文献4

二级参考文献22

  • 1MORITZ H. The Geodetic Reference System 1980 [J]. Journal of Geodesy , 2000,74 : 128-133.
  • 2HEISKANEN W A, MORITZ H. Physical Geodesy[M]. San Francisco:W. H. Freeman, 1967.
  • 3[1]Tom Creel,Arthur J.Dorsey,Philip J.Mendicki.New improved GPS,The Legacy Accuracy Improvement Initiarive[J].GPS World.2006,17 (3):20 -31.
  • 4[2]Michael E.Shaw.Global Positioning System:A Policy and Modernization Review[C].United Nations International Committee on GNSS.Vienna Austria.December,2005.
  • 5[3]Lt Col Wayne Bell.GPS Program Update[C].CGSIC 45th Meeting.Long Beach,California.Sep 2005.
  • 6[4]David A.Turner.Space-Based PNT Modernization Update[C].Munich Satellite Navigation Summit 2006.Munich,21-23 February 2006.
  • 7[5]RD Fontana et al.,The new L2 civil signal[C],in Proc.Inst.Navigation.ION GPS-01 Int.GPS Conf.,Salt Lake City,UT,Sep.2001,pp.617 -631.
  • 8[6]Richard D.Fontana,Wai Cheung,and Tom Stansell.The Modernized L2 Civil Signal[J].GPS World,2001,12(9):28-34.
  • 9[7]Van Dierendonck A.and C.Hegarty.The New L5 Civil GPS Signal[J].GPS World,11(11):.64-71.
  • 10[8]Rajan,J.A.; Tracy,J.A.:GPS IIR-M:Modernizing the Signal-in-Space[C].Proceedings of ION National Technical Meeting,22-24.January 2003,Anaheim,Kalifornien,USA,S.485-493.

共引文献173

同被引文献17

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部