期刊文献+

沪通铁路长江大桥工程河段航道条件及桥墩布置方案 被引量:7

Shanghai-Nantong railway bridge channel condition and bridge pier arrangement
在线阅读 下载PDF
导出
摘要 沪通铁路长江大桥选址在澄通河段中段南通水道进口处,该航段为Ⅰ级航道,此河段由于横港沙及通州沙等影响,河道变化复杂,深泓易摆动,并且桥区河段深水航道稳定对沿江经济发展至关重要,因此桥墩布置方案必须结合深水航道上延需求,充分考虑航道条件变化及通航要求。在充分考虑水文、河床演变、航道条件、航运等因素的基础上,合理布置桥墩方案,以最大限度满足通航要求。 Shanghai-Nantong railway bridge locates at the middle of Chengtong river, a class I chanhnel. The deepwater channel plays an important role to the economy along the stream and the river regime varies due to the influence of Henggang sandbar and Tongzhou sandbar. Thus, the consideration of a variety of channel conditions and shipping transportation for the bridge pier allocation is compulsory. The maximum satisfaction for river transportation could be reached by optimizing bridge pier allocation based on considerations of hydrology, fluvial process, channel condition, shipping transportation, etc.
出处 《水运工程》 北大核心 2012年第3期108-114,共7页 Port & Waterway Engineering
关键词 沪通铁路长江大桥 航道条件 桥墩布置 Shanghai-Nantong railway bridge channel condition bridge pier arrangement
  • 相关文献

参考文献3

  • 1GBJ 139-1990内河通航标准[S].
  • 2JTJ 311-1997,通航海轮桥梁通航标准[S].
  • 3长江航道规划设计研究院.沪通铁路过江通道工程河段航道条件分析与桥墩布置方案研究报告[R].武汉:长江航道规划设计研究院,2010.

共引文献10

同被引文献27

引证文献7

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部