摘要
某别墅工程和车库地基有一较大的不规则的填土坑,地下水位较深,采用柱锤冲扩桩地基处理,经工程检验和沉降观测,处理效果非常满意。
There was a huge and irregular pit with plain fill, the level of ground water is deep. The fill was improved by the impact displacement columns. According to the bearing plate inspection and settlement observation, the treatment of the composite foundation is satisfied.
出处
《工程质量》
2012年第3期56-58,共3页
Construction Quality
关键词
填土
柱锤冲扩碎石桩
地基处理
fill
impact displacement columns
soil treatment