摘要
本文从分析考虑盘车摆度方位进行导轴瓦间隙调整的方法存在的问题入手 ,明确提出对其深入研究是必要的。还介绍了江都排灌站长期采用的不考虑安装摆度的导轴瓦间隙调整方法。
This paper discusses the problems of the method to adjust gaps of the guide bearing pads of large vertical units taking swing into account.It also introduces another method that has been used by Jiangdu pumping station not to consider swing.
出处
《大电机技术》
北大核心
2000年第2期11-13,23,共4页
Large Electric Machine and Hydraulic Turbine