摘要
茂名热电厂循环水改造工程中,对升压泵房热控部分原设计进行了分析,找出了设计上存在的若干漏洞,经过优化设计,消除了原设计中存在的事故隐患,保证了系统的可靠安全运行。
During the transformation of circulating-water system in Maoming Cogeneration Power Plant, the original design of the thermal control part of the booster pump house was analyzed and flaws in the design were found out. The hidden peril of failure was removed through optimization of the design, thus ensuring the reliable operation of the system.
出处
《广东电力》
2000年第1期52-53,共2页
Guangdong Electric Power
关键词
热控系统
优化设计
热电厂
泵房
供水
thermal control system
circulating water system transformation
optimized design