3Yong Huang Lin,Pin-Chan Lee. Effective Evaluation Model under the Condition of Insufficient and Uncertain Information[J].Expert Systems with Applications, 2009,36 : 5600-5604.
4Gopalakrishnan, Kasthurirangan. Instantaneous Pavement Condition E valuation Using Non-Destryctive Neuro Evolutionary Approach[J]. Structure and Infrastructure Engineering,2012,8(9) ;857-872.
5Koduru Hari Krishan, Xiao Feipeng, Amirkhanian Serji N, et al. Using Fuzzy Logic and Expert System Approaches in Evaluating Flexible Pavement Distress:Case Study[J].Journal of Transportation Engineer- ing,2010,136(2) :149-157.
6Moussa Ghada, Hussain Khaled. A New Thchnique for Automatic De tection and Parameters Estimation of Pavement Crack C//IMETI 2011-4th International Multi-Conference on Engineering and Technolog- ical Innovation, Proceedings, 2011,2 : 11 -16.
7Thodesen C C, Lerfald B O, H off L.Review of Asphalt Pavement Eval- uation Methods and Current Applications in Norway[J].Bahic Journal of Road and Bridge Engineering, 2012,7 (4) : 235-240.