钢结构超高工业厂房的安装技术 被引量:7

STEEL STRUCTURE INSTALLATION TECHNOLOGY OF HIGH INDUSTRIAL PLANT
原文传递
导出
摘要 某超高工业厂房工程,安装方案采用分段制作、运输,然后现场高空拼接的施工方案。对上、下节柱的拼接、支撑的安装、钢梁的安装,及钢结构的吊装工艺、吊装顺序、安装要点、质量控制措施进行重点阐述。实践证明:此安装方案解决了超高厂房的运输和安装问题,缩短了施工工期,降低了工程成本,提高了安装质量,取得了良好的综合效益。 The scheme of manufacturing and handing by sections,and high altitude splicing in field was used for a project of the ultra high industrial plant. It was introduced the splicing of columns, support installation and erection of steel beams, and it was expounded mainly the steel structure hoisting process, assembly sequence, key points of installation, quality control measures. The practice has proved that this installation scheme has solved the problems of the high plant transport and installation, shortened construction period, reduced the cost of the project, improved the quality of installation.
出处 《工业建筑》 CSCD 北大核心 2012年第3期113-116,共4页 Industrial Construction
关键词 钢结构 超高工业厂房 安装技术 steel structure super high industrial plant installation technique
  • 相关文献

参考文献8

  • 1GB50205-2001.钢结构工程施工质量验收规范[S].[S].,..
  • 2JGJ81-2002.建筑钢结构焊接技术规程[s].[S].,..
  • 3GB50017-2003.钢结构设计规范[S].[S].,..
  • 4《建筑施工手册》(第4版)编写组.建筑施工手册[M].4版.北京:中国建筑工业出版社,2003.
  • 501SG519多、高层民用建筑钢结构节点构造详图[S].
  • 6李小萍,牙马忠.某单体工程大跨度超高超大钢结构吊装技术[J].山西建筑,2010,36(17):154-156. 被引量:7
  • 7杨大军,程道珍.超高、大跨度单层厂房钢结构安装技术[C]//首届全国钢结构施工技术交流会论文集.北京:2006.
  • 8王桂亮,张峰,谢明光.钢结构重型工业厂房安装技术[J].钢结构,2011,26(3):62-64. 被引量:8

二级参考文献7

共引文献2735

同被引文献20

引证文献7

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部