期刊文献+

大采高沿空掘巷小煤柱稳定性分析 被引量:3

Research on Stability of Gob-side Driving Entry in Large Mining Height Face
在线阅读 下载PDF
导出
摘要 围绕谢桥矿1161(3)工作面特定地质条件,进行了相应大采高沿空掘巷的小煤柱尺寸留设、小煤柱围岩应力场和位移场特征的数值计算。对比不同采深的巷道围岩应力场和位移场特性,给出了不同采深煤柱尺寸留设建议,得出该地质条件下采深500 m应取3~5 m宽度煤柱,采深700 m应取5~7 m宽度小煤柱,超过1 000 m的开采深度煤柱宽度应在7 m以上。 Base on the geology condition of XieQiao mine 1161(3)face,dimension of the small coal pillar of corresponding gobside driving entry in large mining height face,characteristic of stress field and displacement field is calculated.Compared with the characteristic of stress field and displacement field of the drift with different mining depth,it is proposed that-500 m mining depth should take 3~5 m width of the pillar,-700 m mining depth should take 5~7 m width of the small pillar,above-1000 m mining depth should take more than 7m width of coal pillar.
出处 《有色冶金设计与研究》 2012年第1期5-8,18,共5页 Nonferrous Metals Engineering & Research
基金 国家自然科学基金青年科学基金资助项目(50904064) 煤炭资源与安全开采国家重点实验室自主研究课题资助(SKLCRSM09X03)
关键词 大采高 小煤柱 沿空掘巷 数值计算 large mining height small coal-pillar gob-side entry driving numerical calculation
  • 相关文献

参考文献3

二级参考文献4

  • 1王泳嘉,邢纪波.离散单元法同拉格朗日元法及其在岩土力学中的应用[J].岩土力学,1995,16(2):1-14. 被引量:157
  • 2李庶林 王泳嘉.软弱岩层中巷道非线性大变形数值分析.第六届全国岩土力学数值分析与解析方法讨论会论文集[M].广州:广东科技出版社,1998..
  • 3王泳嘉.拉格朗日元法——一种分析非线性大变形的数值方法.第三届华东地区岩土力学学术讨论会论文集[M].武汉:华中理工大学出版社,1995..
  • 4李皓月 周田朋 刘相新.ASYNS工程应用教程[M].北京:中国铁道出版社,2003..

共引文献167

同被引文献21

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部