摘要
本文提出了要重视城市内的步行交通的意见,分别对无信号控制与有信号控制情况下行人过街道通行能力计算方法进行探讨,得出行人过街道通行能力与车道通行能力的关系式,可利用来判断是否修建行人地道或天桥。
In this paper, by pointing out the view that much attention should be paid to urban pedestrian traffic, the author probes into the method for calculating pedestrian crosswalk capacity with or with-out signal control and proposes a formula for both pedestrian crosswalk capacity and traffic lane capacity to decide whether a subway crossing or a skywalk should he built.
出处
《中国公路学报》
EI
CAS
CSCD
北大核心
1990年第1期24-29,共6页
China Journal of Highway and Transport
关键词
人行横道
通行能力
计算
Pedestrian traffic Pedestrian crosswalk capacity Traffic lane capacity Signal control