摘要
1997年4月1日铁路第一次全面提高旅客列车运行速度及1998年10月1日铁路第二次全面提高旅客列车运行速度后走访了长沙机务段等5个机务段,现将走访了解的及查阅的有关资料以及机务部门在提速过程中设备更新、维修运营情况作了介绍并提出建议。
The author of this paper investigated five locomotive depots in nearly two years. Through the investigation and looking up some date, in this paper, the author introduces some new cases about equipment updating, maintenance and management, which the locomotive branch came across after the speed of the passenger trains was improved.
出处
《铁道机车车辆》
2000年第1期33-35,5,共3页
Railway Locomotive & Car
关键词
铁路提速
内燃机车
管理
机务段
improving speed diesel locomotive management