摘要
借鉴上海、伦敦、东京等世界典型大城市在列车提高运能方面的成功经验,根据北京地铁l号线目前的运营状况,剖析了运能紧张的状况并就应对措施进行了探讨。保持当前的列车编组和上线运行列车数,在现有固定闭塞信号系统的条件下,分析各种限速条件和增加点式环线(SpotLoop)装置计算速度码的优化组合,应是提高北京地铁l号线运能的有效方法。
Learning from the experiences of rail transport capacity improvement in metropolis like Shanghai, London and Tokyo ,the capacity tension on Beijing Metro Line 1 is analyzed and some countermeasures are discussed. In the condition of the existing fixed block signaling system and present train marshalling, the optimization grouping of various rate controls a- nalysis and the optimization of spot loop devices increase to calculate the speed rate, shall be a more effective way to enhance the transport capacity on Beijing Metro Line 1.
出处
《城市轨道交通研究》
北大核心
2012年第2期69-73,共5页
Urban Mass Transit