孤岛煤柱应力集中区巷道布置改造及支护技术研究 被引量:1

Isolated island pillar stress area roadway in dashucun mine optimization layout modification and support
在线阅读 下载PDF
导出
摘要 冀中能源峰峰集团大淑村矿-450m水平原东翼三条大巷处于174102、172102工作面和174104、172104工作面中间的孤岛保护煤柱下方,三条大巷均采用锚网索喷支护、局部穿煤段采用U36支架加锚网喷联合支护,应力集中现象明显,巷道变形破坏严重,虽已加强支护并返修多次,但巷道围岩变形仍严重,无法保证正常安全使用。在充分论证和分析后将-450m水平原东翼三条大巷布置在174102和172102工作面采空区下方,只有在172102工作面停采保护煤柱下方应力集中范围内巷道围岩变形较严重,通过维修和加强支护后,巷道基本稳定,其他位置巷道较稳定。 Fengfeng Jizhong energy group Dashucun mine-450m levels in former East Wing three lane in 174102,172102,and 174104 working face in 172104 working face of the protective coal pillar beneath the middle island,three lane using the anchor rope supporting in coal,local section of the use of U36 bracket plus anchor net combined support,stress concentration phenomenon is obvious,the roadway deformation destruction,although already reinforced support and repaired many times,but the roadway surrounding rock deformation is serious,cannot ensure the normal and safe use of.In the full theory and analysis of evidence after the 450m level in former East Wing three roadway layout in the 174102 and 172102 working face goaf below,is currently driving construction process,only in 172102 working face mining stopped protective coal pillar stress concentration range below the roadway surrounding rock deformation is more serious,the repair and reinforcement after supporting the roadway,basically stable,the other position roadway stability.
出处 《华北科技学院学报》 2011年第4期10-13,共4页 Journal of North China Institute of Science and Technology
关键词 孤岛煤柱 应力集中区 巷道布置 巷道支护 isolated coal pillar stress concentrated area roadway layout optimization roadway support
  • 相关文献

参考文献3

共引文献40

同被引文献15

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部