期刊文献+

风险地图—环境风险管理的有效新工具 被引量:13

Environmental Risk Mapping:A New Effective Instrument for Environmental Risk Management
在线阅读 下载PDF
导出
摘要 中国不断发生的重大环境突发事故使得环境风险管理提上了政府的议事日程,建立有效和实用的环境风险管理体系势在必行。近年来,风险地图已成为环境风险管理中迅速崛起的新领域。风险地图不但可以探讨污染物效应的空间特征,而且可作为风险可视化的重要工具。通过调研和分析大量文献,在描述了环境风险地图的功能、重要的风险地图类型基础上,以一个城市为例展示了风险图制作流程,最后,对环境风险地图在中国的应用和发展提出了建议。 The increasing occurrence of major environmental accidents has quickly put environmental risk management onto the top of governmental agendas, and has called for the effective instrument for environmental risk management. With the development of geographic information systems (GIS) over the past few decades, environmental risk mapping has become an emerging field. Risk maps have helped risk analysts and scientists to explore the spatial features of environmental incidents, and have become a powerful tool for visualization and communication of environmental risk management among the stakeholders. The function and classification of environmental risk map were presented through indepth review, with a specific city as a case for describing the operational framework of environmental risk mapping. Suggestions were also given for developing environmental risk maps in China.
出处 《生态毒理学报》 CAS CSCD 北大核心 2012年第1期1-9,共9页 Asian Journal of Ecotoxicology
基金 国家自然科学基金(71103175) 中瑞科技合作项目(GJHZ0910) 荷兰皇家科学院和中国科学院国际合作项目(10CDP030)
关键词 环境风险地图 风险管理 政策建议 environmental risk mapping risk management policy suggestion
  • 相关文献

参考文献50

  • 1叶超,褚晓亮,刘大江.“化工炸弹”围城,中国工业灾害被指人祸[OL].经济参考报第5版,http://dz.jjckb.cn/WWW/pages/webpage2009/html/2010-08/23/node_44.htm.
  • 2XhthuaNewsAgency.Half ofChina'sChemicalPlantsEndangerEnvironment [OL]. 12July 2006, http://www.china. org.en/english/envh'onment/174430.htm.
  • 3国家统计局工业交通统计司.中国工业经济统计年鉴2009[M].北京:中国统计出版社,2009.
  • 4联合早报.中国掀环境污染"严打风暴"40万家化工企业将受排查[OL].http://www.zaobao.com/zg/zgl00902_007.shtml.
  • 5PistocchiA.Ecological andHumanHealthRiskAssessment:Focusing onComplexChemicalRiskAssessment and the I-dentification of highest risk conditions [R].No.EUR 22625EN. Ispra, Italy:JointResearchCentre,EuropeanCommis-sion,2006.
  • 6BournayE,UNEP/GRID-Arendal.TiszaRiverAssessment [R].UNEP 2004, http://www.environmenttimes.net/edition. cfm? pageID = l&groupID.
  • 7FabbriL,JirsaP,ContiniS.BenchmarkExercise inQuantitativeAreaRiskAssessment inCentral andEasternEuropeanCountries (BEQUAR) [R].FinalReport,JRC, Ispra,EUR 22169EN, 2007.
  • 8GordonB,MacKayR,RehfuessE. Inheriting the world:The atlas of children's health and the environment [R].Geneva:WorldHealthOrganization, 2004.
  • 9SaboritJS,MaureenW,R bertJ.RiskMapping of IndustrialHazards inNewMemberStates.EUR-Scientific andTechnicalResearch series [R].Luxembourg:Office forOfficialPublications of theEuropeanCommunities.EUR 22900EN, 2007, 38.
  • 10GuptaAK,esmukhS IV.EnvironmentalRiskAssessment andMitigationAnalysis:PolicyApproach toNaturalisasterReduction,Naturalisasters -Some Issues andConcerns [M].Shantiniketan:VisvaBharatiUniversity, 1999, 148 - 161.

同被引文献240

引证文献13

二级引证文献133

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部