狮子洋隧道过小虎沥水道施工技术 被引量:10

Construction Technique for the Shiziyang Tunnel Passing through the Xiaohuli Waterway
在线阅读 下载PDF
导出
摘要 文章以广深港铁路客运专线狮子洋隧道盾构法穿越小虎沥水道工程为例,重点介绍了过江施工过程中的风险点及重难点,并提出了盾构刀具配置、开挖面泥水压力控制及处理系统管理、背后注浆、盾尾漏浆防治等针对性技术及措施。 This paper uses the shield-driven Shiziyang Tunnel,which passes through the Xiaohuli Waterway on the Guangzhou-Shenzhen-Hongkong Passenger Dedicated Line,as an example to introduce engineering geological and hydrogeological conditions as well as their risk points,key aspects and difficulties.Meanwhile,it also presents such techniques as the configuration of shield cutters,slurry pressure control and treating system management,back grouting and prevention of grout running at the shield tail.
作者 刘广钧
出处 《现代隧道技术》 EI 北大核心 2012年第1期126-131,共6页 Modern Tunnelling Technology
关键词 泥水盾构 复合地层 穿越施工 风险 措施 Slurry shield Mixed ground Construction passing through waterway Risk Measures
  • 相关文献

参考文献4

二级参考文献5

  • 1朱伟.隧道标准规范(盾构篇)及解说[M].北京:中国建筑工业出版社,2001..
  • 2程晓 张凤祥.土建注浆施工与效果检测[M].上海:同济大学出版社,1998.462.
  • 3程晓.盾构施工技术[M].上海:上海科学技术文献出版社,1990..
  • 4[日]土木学会编.盾构标准规范(盾构篇)及解说.朱伟译[M].中国建筑工业出版社,2001
  • 5Bernhard Maidl, Martin Herrenknecht, Lothar Anheuser,Mechanical shield tunneling[M]. Germany: Ernst&Sohn,1996

共引文献29

同被引文献104

引证文献10

二级引证文献175

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部