期刊文献+

务川沙坝水电站坝体外部变形监测分析 被引量:3

An Analysis of Shaba Dam Hydropower Station Exterior Deformation Monitor
在线阅读 下载PDF
导出
摘要 介绍了贵州省务川县沙坝水电站碾压混凝土双曲拱坝坝体外部变形监测控制网布置情况。通过对工程下闸蓄水初期和运行期坝体外部变形监测资料的分析,初步掌握了建筑物整体位移变形情况和运行情况,为沙坝水电站的正常运行管理提供必要的决策信息。 This paper introduces mainly the arrangement of monitoring control network of Wuchuan County rolled concrete double-curvature arch sandbank hydroelectric station in Guizhou Province.By a close comparison and analytic study of the data of initial and runtime water impoundment moment under engineering conditions,this paper achieves primary knowledge of deformation and operation on the dam's integrated displacement,and gives information of decision-making to the manager.
出处 《中国农村水利水电》 北大核心 2012年第2期127-130,共4页 China Rural Water and Hydropower
关键词 碾压混凝土拱坝 外部变形 变形监测 RCC arch dam exterior distortion distortion monitor
  • 相关文献

参考文献5

  • 1电力行业标准DL/T5178-2003,混凝土坝安全监测技术规范[S].
  • 2陈浩,庞先明,林根源.务川沙坝水电站工程竣工验收安全监测管理工作报告[R].贵阳:贵州省大坝安全监测中心,2007.
  • 3务川自治县沙坝水电站初步设计报告[R].贵阳:贵州省水利水电勘测设计研究院,2004.
  • 4魏鹏,陈树联,张群,张雷.拉西瓦水电站拱坝安全监测设计[J].水力发电,2009,35(11):16-18. 被引量:6
  • 5孙建会,张玉华,王万顺,苏方平.重庆江口水电站拱坝坝体变形监测分析[J].中国水利水电科学研究院学报,2004,2(4):307-314. 被引量:5

二级参考文献6

  • 1厉易生,陈玉夫,杨波,贾金生.江口椭圆拱坝优化设计[J].中国水利水电科学研究院学报,2003,1(3):221-225. 被引量:11
  • 2二滩水电开发有限责任公司.岩土工程安全监测手册[K].1998.
  • 3西北勘测设计研究院.黄河拉西瓦水电站工程可行性研究报告[R].2002.
  • 4西北勘测设计研究院.拉西瓦水电站初期蓄水阶段设计自检报告[R].2009.
  • 5[2]王万顺,孙建会.重庆江口水电站水工建筑物安全监测成果分析报告[R].北京:中国水利水电科学研究,2003.
  • 6姚栓喜,李蒲健,雷丽萍.拉西瓦水电站混凝土双曲拱坝设计[J].水力发电,2007,33(11):30-33. 被引量:9

共引文献11

同被引文献8

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部