期刊文献+

单机模糊加工时间下最迟开工时间调度问题 被引量:1

Single Machine Ready Time Scheduling with Fuzzy Processing Time
在线阅读 下载PDF
导出
摘要 研究单机模糊加工时间下确定最迟开工时间的调度问题。目标是在满足每个工作都以大于等于各自指定的隶属度属于完工集合的约束下,寻找工作的最大最迟开工时间。通过模糊数学知识对模型进行分析,对于特殊情况给出了问题的最优解,对于一般情况给出了一个最优解的必要条件。 A scheduling problem on the single machine with fuzzy processing time is studied. The objective is to obtain maximize the ready time of the scheme as late as possibility within the constraint that the grade of each jobs in the completion set is not less than a given value respectively. Through analyzing the model by applying fuzzy mathematics extension principles and the properties of jobs with fuzzy processing times, the optimal solutions of the problem are presented under some special cases, and a necessary condition of optimal solution is given under the general case.
出处 《控制与决策》 EI CSCD 北大核心 2000年第1期71-74,共4页 Control and Decision
基金 国家自然科学基金项目!(69684005) 灿坤电器实业股份有限公司项目
关键词 模糊加工时间 最迟开工时间 隶属函数 调度 fuzzy processing time, ready time, membership function, scheduling problems
  • 相关文献

参考文献1

二级参考文献1

  • 1刘玉琏,傅沛仁.数学分析讲义[M]高等教育出版社,1992.

共引文献6

同被引文献18

  • 1周宏根,戚雪峰,景旭文,王黎辉.基于遗传算法的作业车间调度研究与应用[J].现代制造工程,2006(8):5-8. 被引量:8
  • 2Ishibuchi H,Yamaoto H,Murata H.Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problem[J].Fuzzy Sets and Systems,1994,67(1):81-100.
  • 3Ishibuchi H,Murata H,Lee L H.Formulation of fuzzy flowshop scheduling problems with fuzzy processing time[C].Proceedings of the 5th IEEE International Conference on Fuzzy System,NewYork,NY,USA:IEEE,1996:199-205.
  • 4Tsujimura Y,Gen M,Kubota H.Solving job-shop scheduling problems with fuzzy processing time using genetic algorithms[J].Journal of Japan Society for Fuzzy Theory and Systems,1995,7(2):1073-1083.
  • 5Murata T,Gen M,Ishibuchi H.Multi-objective scheduling with fuzzy due-data[J].Computers & Industrial Engineering,1998,35(3):439-442.
  • 6Adamopoulos G L,Pappis C P.A neighbourhood-based hybrid method for scheduling with fuzzy due-dates[J].International Transactions in Operational Research,1998,5(3):147-153.
  • 7Lam S S,Cai S.Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates[J].Nonlinear Analysis:Real World applications,2002,3(2):307-316.
  • 8Lin F L.A job-shop scheduling problem with fuzzy processing times.Proceedings of International Conference on Computational Science Part Ⅱ[M].Berlin Heidelberg:Springer,2001:409-418.
  • 9Wang C Y,Wang D Y,Ip W H.The single machine ready time scheduling problem with fuzzy processing time[J].Fuzzy Sets and Systems,2002,127(2):117-129.
  • 10Peng J,Liu B D.Parallel machine scheduling models with fuzzy processing times[J].Information Sciences,2004,164(1):1-18.

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部