5K I Gidado.Project complexity:The focal point of construction production planning[J].Construction Management and Economics,1996,14 (5):213-225.
6David Baccarini.The concept of project complexity-a review[J].International Journal of Project Management,1996,14(4):201-204.
7Pich Christoph,Michael T,Arnoud De Meyer.On Uncertainty,Ambiguity and Complexity in Project Management[J].Management Science,2002 (8):1008-1023.
8Calvano C N,John P.Systems Engineering in an Age of Complexity[J].System Engineering,2004 (7):25-34.
9Winter M,Smith C,Morris P.Directions for future research in project management:The main findings of a UK government-funded research network[J].International Journal of Project Management,2006,24 (8):638-649.
2Levi kangas P, L hesmaa J. Profitability evaluation of intelligent transport system investments [ J ]. Journal of Transportation Engineering, 2002, 128 (3): 276-286.
3Ford D N, Lander D M, Voyer J J. A real option approach to valuing strategic flexibility in uncertain construction projects [ J ]. Construction Management and Economies, 2002, 20 (4): 343-351.
4Trigeorgis L. Real Options: Managerial Flexibility and Strategy in Resource Allocation [ M ]. Cambridge: The MIT Press, 1999.
5Garvin M J, Cheah C Y J. Valuation techniques for infrastructure investment decisions [ J ]. Construction Management and Economics, 2004, 22 (4): 373-383.
6Ho S, Liang Y. An option pricing-based model for evaluating the financial viability of privatized infrastructure projects [ J ]. Construction Management and Economics, 2002, 20 (2): 143-156.
7Yu-Lin Huang, Shih-Pei Chou. Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects [ J]. Construction Management and Economics, 2006 (24): 379-389.
8Charles Y J Cheah, Jicai Liu. Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation [ J ]. Construction Management and Economics, 2006 (24): 545-554.
9Miller K D, Waller G H. Scenarios, Real Option and Integrated Risk Management [ J]. Long Range Planning, 2003 (36): 93-107.