期刊文献+

铁辊车间生产物流系统的优化与仿真 被引量:4

Optimizing production logistics system of iron roller workshop based on simulation
在线阅读 下载PDF
导出
摘要 在分析铁辊车间生产物流系统现状的基础上,运用系统布置设计和系统搬运分析方法对物流系统进行了优化,并构建了优化方案的TCPN动态模型,使用Witness仿真软件对优化方案的运行过程进行了模拟。仿真结果表明,铁辊车间每班次的产量比优化之前提高10.9%,物流不再是该车间的生产瓶颈。铁辊车间还存在的问题是该车间处于较明显的生产不平衡状态,仿真结果为进一步提高铁辊车间的生产效率指明了方向。 The production logistics system of iron roller workshop was optimized using System Layout Planning(SLP) and System Handling Analysis(SHA) based on analyzing its status,and TCNP dynamic model of optimization programs was constructed,Witness simulation software simulated function of optimization programs.Simulation results show that the production of each frequency in this iron roller workshop increase 10.9% than before optimization,logistics is no longer a bottleneck.An imbalance of production is obvious in this iron roller workshop,it points out the direction in order to further improving the productivity.
出处 《现代制造工程》 CSCD 北大核心 2012年第2期61-66,共6页 Modern Manufacturing Engineering
基金 广东石油化工学院2010年青年创新人才培育项目(2010yc10)
关键词 WITNESS仿真 PETRI网 TCPN模型 生产物流系统 铁辊车间 Witness simulation Petri net TCPN model production logistics system iron roller workshop
  • 相关文献

参考文献6

  • 1董明,吴一帆,吴畅,侯文皓.随机需求下半导体生产车间的物流系统仿真优化[J].上海交通大学学报,2010,44(3):306-310. 被引量:2
  • 2Drira A, Pierreval H, Hajri-Gab0uj S. Facility layout prob- lems : A survey [ J ]. Annum Reviews in Control' 2007 ( 31 ) : 255 - 267.
  • 3王亚超.生产物流系统建模与仿真[M].北京:科学出版社,2001.
  • 4Cui Y D, Huang L. Dynamic programming algorithms for gen- erating optimal strip layouts [ J ]. Computational Optimization and Applications ,2006,33 (23) :287 - 301.
  • 5Fung S H. A virtual warehouse system for production logistics [J]. Production Planning and Control,2005(6) :597 -037.
  • 6夏天,徐克林,洪旭东.基于混合Petri网的PCBA制造系统的建模与仿真[J].现代制造工程,2009(9):45-50. 被引量:2

二级参考文献21

  • 1胡红革,宋亚辉,黄大贵.用混合Petri网对微开关加工系统建模和仿真[J].仪器仪表学报,2004,25(z3):98-100. 被引量:2
  • 2王文利,白世贞.基于离散-连续联合建模的供应链混合Petri网仿真研究[J].科学技术与工程,2006,6(15):2402-2406. 被引量:6
  • 3唐伟强,何嘉洲,王建洲.基于混合Petri网对热收缩膜包装系统建模和控制[J].农业机械学报,2006,37(8):197-200. 被引量:2
  • 4Kusiak A, Heragu S S. The facility layout problem [J]. European Journal of Operational Research, 1987,29: 229-251.
  • 5Bos J. Zoning in forest management a quadratic assignment problem solved by simulated annealing [J]. Journal of Environmental Management, 1993, 37: 127-145.
  • 6Norman B A, Smith A E. A continuous approach to considering uncertainty in facility design [J]. Compulers and Operations Research, 2006, 33: 1760- 1775.
  • 7Drira A, Pierreval H, Hajri-Gabouj S. Facility layout problems: A survey[J].Annual Reviews in Control, 2007, 31: 255-267.
  • 8Rosenblatt M J. The dynamics of plant layout[J]. Management Science, 1986, 32(1) : 76-86.
  • 9Urban T L. Solution procedures for the dynamic facility layout problem [J]. Annals of Operations Research, 1998, 76:323-342.
  • 10Balakrishnan J, Jacobs F R, Venkataramanan M A. Solutions for the constrained dynamic facility layout problem[J]. European Journal of Operational Research, 1992, 57: 280-286.

共引文献2

同被引文献35

引证文献4

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部