主要从理论上阐述某60万t甲醇动力站主厂房主体框(排)架结构(主要有4.17 m,7.97 m,14.97 m,26.47 m,29.57 m,35.47 m等结构层,轴线跨度8.0 m)的脚手架搭拆及结构、安全性验算和用于指导实践的施工方法及施工过程的危险点(源)的控制。
ain theorized a 600000 tons methanol power station main workshop of main body box(row) frame structure(mainly has 4.17 m,7.97 m,14.97 m,26.47 m,29.57 m,35.47 m structure layer,axis span 8.0 m) by the scaffold structure,demolition and safety check and used to guide the practice of the construction methods and the construction of the danger point(source) control
出处
《广东化工》
CAS
2012年第2期151-153,共3页
Guangdong Chemical Industry
关键词
脚手架
搭拆
验算
施工
scaffolding
build open
checking
construction