土压平衡式盾构掘进过程的相似模型试验 被引量:43

Similarity model test of Earth-Pressure-Balanced shield tunneling process
原文传递
导出
摘要 土压平衡式盾构掘进过程是一个多系统综合运作的复杂力学过程。为实现土压平衡盾构掘进过程的相似模拟,设计制造能够完成掘削面开挖、螺旋出土器出土、盾构机推进、管片拼装、盾尾注浆等全过程模拟的土压平衡式模型盾构机。其次对盾构-地层系统的相关参量进行甄别,选出对试验结果有重要影响的参量,同时基于相似理论,通过量纲分析的方法得到盾构-地层系统的相似准则。基于该相似准则,进行土压平衡式盾构掘进过程的室内相似模型试验,获得土压平衡式盾构掘进对地层影响的一般规律,该试验结果经过相似关系换算后可直接反映出原型中的实际地层沉降量。这种能够实现掘进全过程模拟的土压平衡式模型盾构机为深入研究盾构施工对地层及周围环境的影响提供新手段。 Earth-Pressure-Balanced (EPB) shield tunneling is a complex mechanical process that involves multiple integrated operations. A physical EPB shield model is designed and manufactured to simulate the process of EPB shield tunneling, including excavation, mucking, shield advance, segment assembly, tail grouting, etc. Parameters in the shield-ground system that may significantly affect the model test result are identified. Based on similitude theory, model similarity is obtained through dimensional analysis. The general characteristics of EPB shield tunneling are obtained through model test and similarity conversion. The EPB shield model can be employed for simulation of EPB shield tunneling process and for studying the influences on the surrounding environment.
机构地区 西南交通大学
出处 《土木工程学报》 EI CSCD 北大核心 2012年第2期162-169,共8页 China Civil Engineering Journal
基金 国家自然科学基金(50925830 50908193) 国家973计划课题(2010CB732105)
关键词 土压平衡式盾构 掘进过程 相似模型试验 盾构-地层系统 Earth-Pressure-Balanced (EPB) shield tunneling process similarity model test shield-ground system
  • 相关文献

参考文献12

二级参考文献49

共引文献502

同被引文献372

引证文献43

二级引证文献369

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部