摘要 应用常规两塔斜拉桥的计算方法,得出了下拉索体系多塔斜拉桥的简化静力计算公式;建立了有限元分析模型,以下拉索的位置设置为参数,分析了下拉索布置对主梁受力的影响。结果表明:设置下拉索局部地增加了主梁轴力,但弯矩却相应地减小,对主梁的承载影响较小。 Through the application of the calculation method of the conventional two towers cable-stayed bridge,the simplified static calculation formula of a structural system of multi-tower cable-stayed bridge with tie-down cables is got.Furthermore,a finite element analysis model is established.Taking different set locations of the tie-down cable as parameters,the impact of the tie-down cable layout on the force of main girder is analyzed.The results show that: setting up the tie-down cable can locally increase the axial force on the main girder,but reduce the moment correspondingly;and the bearing on the main beam is less affected by setting up the tie-down cable.
出处 《重庆交通大学学报(自然科学版)》 CAS 北大核心 2011年第6期1275-1277,1281,共4页 Journal of Chongqing Jiaotong University(Natural Science)
关键词 多塔斜拉桥 下拉索 主梁 有限元分析 multi-tower cable-stayed bridge tie-down cable main girders finite element analysis
  • 相关文献

参考文献6

  • 1顾安邦,范立础.桥梁工程:下册[M].北京:人民交通出版社,2007:302-304.
  • 2郑春,刘晓东.论多塔斜拉桥的刚度[J].公路,2002,47(6):98-100. 被引量:21
  • 3胡建华,廖建宏,等.多塔斜拉桥关键技术研究[J].中外公路,2002,22(3):32-36. 被引量:17
  • 4刘小明.下拉索多塔斜拉桥结构体系分析研究[D].重庆:重庆交通大学,2010.
  • 5卢昌明.单索、多塔预应力混凝土斜拉桥结构性能研究[D].福州:福州大学,2004.
  • 6[ France ] Michel Virlogenx. Bridge with multiple cable-stayed spans [ J]. Structural Engineering International, 2011, 11 ( 1 ) :61 - 82.