摘要 以某工程为研究背景,通过二维和三维数值模拟,分析了人工挖孔桩的施工过程对紧邻基坑围护结构的影响,并根据计算结果对其进行专项设计.结果表明:人工挖孔桩施工过程中的空间拱效应明显;在直径3.0 m的挖孔桩距离围护结构约5.0 m的情况下,仅需采取简单的设计措施,即可保证围护结构的安全性. Based on an engineering case,2D and 3D finite-element tools were employed to analyze the mutual impact of constructing hand-dug piles close to retaining wall.Combined with the analysis data,some measures were implemented.The results show that the hand-dug piles have obvious space arch effect.When the net distance between 3 meter diameter hand-dug piles and retaining wall is 5 meters,only simple design measures are needed to ensure the safety of the foundation pit.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2012年第1期84-88,共5页 Journal of Shanghai Jiaotong University
关键词 深基坑 人工挖孔桩 施工 数值分析 foundation pit hand-dug pile construction numerical analysis
  • 相关文献

参考文献4

二级参考文献12

  • 1王新征,魏胜林.人工挖孔桩在某大型工程项目中的应用[J].山西建筑,2007,33(21):109-110. 被引量:3
  • 2中华人民共和国建设部.JGJ94-2008建筑桩基技术规范[S].北京:中国建筑工业出版社,2008.
  • 3中国建筑科学研究院.JGJ-2002,建筑地基处理技术规范[S].北京:中国建筑工业出版社,2002.
  • 4广州市城市规划勘察设计研究院《岩土工程勘察报告》[R].2006.
  • 5朱奎,潘三豹,陈中华,陈林.穿越流沙层人工挖孔桩施工工法[C].第十届全国地基处理学术讨论会,2008.
  • 6钱家欢 殷宗泽.土工计算原理[M].北京:中国水利水电出版社,1996.362-358.
  • 7Bowles Joseph E. Foundation analysis and design[M]. New York:McGraw-Hill Book Company, 1982.
  • 8Tomlinson M J. Pile design and construction practice[M]. New York: E&FN SPON, 1994.
  • 9施峰 柳春 蔡来炳.福州地区人工挖孔桩承载力的研究[R].福州:福建省建筑科学研究院,1997..
  • 10刘笔艳,张威,李逸行.在含水砾砂层中施工人工挖孔桩的技术措施[J].施工技术,2007,36(9):33-34. 被引量:6

共引文献32

同被引文献72

引证文献12

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部