期刊文献+

上向水平进路充填采矿法在和睦山铁矿的应用研究 被引量:27

Application of upward horizontal slice stoping and backfilling method in Hemushan Iron Mine
在线阅读 下载PDF
导出
摘要 运用分段空场嗣后充填采矿方法后,和睦山铁矿后观音山矿段出现矿岩节理发育、采场安全性较差、矿石损失率较大等问题。基于采场作业安全、地压稳定、提高矿石回收率等方面考虑,提出了上向水平进路充填采矿法。通过对比分析,结果表明该方法具有安全可靠和经济技术指标先进等优点,使矿山总体效益提高。 Mining method of sublevel open stoping with subsequent backfilling was used in Hemushan Iron Mine.Rock joints,poor stope stability and large ore loss occur during the mining of Houguanyinshan iron ore body.In order to ensure safety of mining,stability of ground pressure,and higher recovery rate,the upward horizontal slice stoping and backfilling method is recommended.Through comparison and analysis,it shows that the method is safe and reliable,and is more advanced in economic and technical indicators than that of mining method of sublevel open stoping with subsequent backfilling.
出处 《有色金属(矿山部分)》 2012年第1期13-16,共4页 NONFERROUS METALS(Mining Section)
关键词 充填采矿法 上向进路 经济技术指标 backfilling method upward drift economic and technical indicators
  • 相关文献

参考文献4

二级参考文献13

共引文献48

同被引文献147

引证文献27

二级引证文献131

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部