地铁隧道盾构施工对新装环管片受力的影响 被引量:2

Stress Analysis of Newly Installed Segments during Shield Driving
在线阅读 下载PDF
导出
摘要 通过分析新装环在其邻近环施工过程中钢筋的量测数据,得出覆土范围在8~10 m内的浅埋段新装管片在盾构施工过程中主筋和分布筋的应力变化规律和原因:邻近环推进时盾构反推力对管片受力影响不明显,主要影响来自于同步注浆,管片左右45°及135°处附近的位置在邻近环注浆过程中受力变化明显。 After analyzing the measured data of the reinforcement stresses in newly installed shield ttmnel segments during shield driving on the section with 8 to 10m overburdens, authors revealed the reason of stress variations ha main and distr^ution reinforcement bars of the segments. Shield reverse thrusts had little effect on the stresses, while synchronous grouting had great influence. Stresses in the region included from 45% left to 135% right changed significantly during grouting in the adjacent segment ring. As a result, the pressures and stress redistribution must be rationally regulated to avoid fracture in the segments.
出处 《都市快轨交通》 2011年第6期77-80,共4页 Urban Rapid Rail Transit
基金 国家自然科学基金项目(50778012) 苏州轨道交通盾构隧道管片合理设计及优化研究项目(C09L00500)
关键词 地铁 隧道 管片受力 盾构施工 同步注浆 subway tunnel segment stress shield synchronous grouting
  • 相关文献

参考文献9

二级参考文献46

共引文献314

同被引文献9

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部