期刊文献+

基于移峰填谷的排水泵站优化调度研究 被引量:15

Optimal operation study of pumping stations with load shifting
原文传递
导出
摘要 采用改进的动态规划算法对定速泵排水泵站的优化调度问题进行求解,考虑了峰谷分时电价制度对电费的影响,以一座配有两台定速泵的排水泵站为例,首先建立了该泵站的物理模型和动态规划模型,然后构造了改进动态规划算法并详细分析了该算法的主要思想和求解算法时的编程思路,最后计算出了双泵控制下的最优启停控制序列和优化结果,并将该结果与传统控制下的运行结果进行了比较分析.与其他的优化算法相比,其计算时间大大缩短,而且能效优化效果明显. An improved dynamic programming algorithm is proposed for the optimal operation scheduling of a drainage pumping station with the time-sharing electricity price.A pump station equipped with two fix-speed pumps is employed as a case study.The physical model of the pump station is built firstly;and then,an improved dynamic programming algorithm is proposed;and its main ideas and programming procedures are analyzed.Finally,the optimal schedule sequence of the two pumps is calculated.The optimization results are compared with the traditional operating strategies;and the significant economical benefits are obtained for the drainage pumping station with the proposed algorithm.
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2011年第6期773-778,共6页 Engineering Journal of Wuhan University
基金 湖北省流体机械与动力工程装备技术重点实验室开放研究基金 中国-南非联合研究计划项目(编号:CS05-L07)
关键词 排水泵站 分时电价 动态规划 优化调度 drainage pumping station time-sharing electricity price dynamic programming optimal operation
  • 相关文献

参考文献16

  • 1Van Staden A J, Zhang J, Xia X. A model predictive control strategy for load shifting in a water pumping scheme with maximum demand charges[C]//Proceed- ings of the IEEE Bucharest PowerTech Conference, 2009.. 1-7. Cheng D Z. Controllability of Switched Bi- linear Systems. IEEE Trans. on Automatic Control, 2005,50(4) : 511-515.
  • 2朱满林,杨晓东,白丹.长距离输水泵站机组选型探讨[J].西北水电,1998(1):25-27. 被引量:1
  • 3Vieira Filipe, Ramos Helena M. Optimization of oper- ational planning for wind/hydro hybrid water supply systems[J]. Renewable Energy, 2009, 34 (3) .. 928- 936.
  • 4Pasha M F K, Lansey K. Optimal pump scheduling by linear programming[C]//Proceedings of World Envi- ronmental and water Resources Congress, 2009: 395- 404.
  • 5Yang Z, Brsting Hakon. Optimal scheduling and con- trol of a multi-pump boosting system[C]//Proceedingsof the IEEE International Conference on Control Ap- plications, 2010 ..2071-2076.
  • 6汪安南,伍杰.大型轴流泵站最优运行方式探讨[J].农田水利与小水电,1993(11):36-38. 被引量:14
  • 7朱满林,杨晓东,张言禾.梯级泵站优化调度研究[J].西安理工大学学报,1999,15(1):67-70. 被引量:20
  • 8TanakaNaruhisa, Tatano Hirokazu, Okada Norio. Optimal operation model of an urban drainage system under partial state observation[C]//Proceedings of the IEEE International Conference, 1999..967-972.
  • 9吴凤燕,张雷,刘冬梅.混合遗传算法在泵站优化运行中的应用[J].水泵技术,2004(6):32-36. 被引量:4
  • 10朱劲木,李强,龙新平,赵文.梯级泵站优化运行的遗传算法[J].武汉大学学报(工学版),2008,41(1):108-111. 被引量:16

二级参考文献29

共引文献54

同被引文献131

引证文献15

二级引证文献87

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部