同类机环境下不同尺寸工件的分批调度问题 被引量:10

Batch scheduling on uniform parallel machines with non-identical job sizes
在线阅读 下载PDF
导出
摘要 为了有效地利用批处理机,提高生产效率,提出了同类机加工环境下具有不同尺寸工件的批处理机调度问题并进行了求解。由于该问题是NP难解的,给出了一个下界以衡量近似算法的性能,并证明了该下界的有效性。提出了批的隐性加工时间的概念,并以此为基础给出了一种新的局部优化算法,对最大最小蚁群算法进行了改进。使用启发式算法最终对同类机环境下分批调度问题进行求解。通过仿真实验将该蚁群算法与遗传算法、微粒群优化算法及BFLPT等进行比较和性能分析。 To improve the production efficiency by using batch processor effectively,a batch scheduling problem with non-identical job size on uniform parallel machines was proposed and solved.This problem was proved to be NP-hard,thus a lower bound was presented to evaluate the performance of approximation algorithms,and the validity of this lower bound was proved.On the basis of recessive processing time concept,a new local optimization algorithm was proposed to improve the max-min ant algorithm.A heuristic algorithm named Longest Processing Time for Uniform Machines(LPTUM) was used to solve the problem.Through simulation experiment,the proposed algorithm was compared to genetic algorithm,particle swam optimization and BFLPT,as well as the performance was analyzed.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2012年第1期102-110,共9页 Computer Integrated Manufacturing Systems
基金 创新研究群体科学基金资助项目(70821001) 高校博士点基金资助项目(200803580024) 国家自然科学基金资助项目(71171184)~~
关键词 同类机 批调度 蚁群优化算法 组合优化 启发式算法 uniform parallel machines batch scheduling ant colony optimization combinatorial optimization heuristic algorithms
  • 相关文献

参考文献20

  • 1UZSOY R. Scheduling a single batch processing machine with nonidentical job sizes[J]. International Journal of Production Research, 1994,32(7): 1615-1635.
  • 2ZHANG G C, CAI X Q, LEE C Y, et al. Minimizing makes- pan on a single batch processing machine with nonidentical job sizes[J]. Naval Research Logistics,2001,48(3) :226-240.
  • 3DUPONT L, GHAZVINI F J. Minimizing makespan on a sin gle batch processing machine with non-identical job sizes[J]. Journal Europeen des Systemes Automatis6s, 1998,32 (4) : 431-440.
  • 4MELOUK S, DAMODARAN P, CHANG P Y. Minimizing makespan for single machine batch processing with non-identi cal job sizes using simulated annealing[J]. International Jour- nal of Production Economics,2004,87(2) : 141-147.
  • 5DAMODARAN P, MANJESHWAR P K, SRIHARI K. Min- imizing makespan on a batch-processing machine with non i- dentical job sizes using genetic algorithms[J]. International Journal of Production Economics, 2006,103 (2) : 882-891.
  • 6王栓狮,陈华平,程八一,李燕.一种差异工件单机批调度问题的蚁群优化算法[J].管理科学学报,2009,12(6):72-82. 被引量:21
  • 7许瑞,陈华平,邵浩,王栓狮.极小化总完工时间批调度问题的两种蚁群算法[J].计算机集成制造系统,2010,16(6):1255-1264. 被引量:21
  • 8杜冰,陈华平,邵浩,许瑞,李小林.具有不同到达时间的差异工件批调度问题的蚁群聚类算法[J].系统工程理论与实践,2010,30(9):1701-1709. 被引量:5
  • 9CHOU F D, CHANG P C, WANG H M. A hybrid genetic al gorithm to minimize makespan for the single batch machine dy namic scheduling probtem[J]. International Journal of Ad vanced Manufacturing Technology, 2006,31 (3/4) : 350-359.
  • 10CHANG P Y, DAMODARAN P, MELOUK S. Minimizing makespan on parallel batch processing machines[J]. Interna- tional Journal of Production Research, 2004, 42 (19): 4211-4220.

二级参考文献68

共引文献44

同被引文献126

  • 1段海滨,马冠军,王道波,于秀芬.一种求解连续空间优化问题的改进蚁群算法[J].系统仿真学报,2007,19(5):974-977. 被引量:74
  • 2刘志硕,申金升,关伟.车辆路径问题的混合蚁群算法设计与实现[J].管理科学学报,2007,10(3):15-22. 被引量:19
  • 3POTTS C N,VAN WASSENHOVE L N.Integrating scheduling with batching and lot-sizing:a review of algorithms and complexity[J].Journal of the Operational Research Society,1992,43 (5):395-406.
  • 4POTTS C N,KOVALYOV M Y.Scheduling with batching:A review[J].European Journal of Operational Research,2000,120 (2):228-249.
  • 5DAMODARAN P,SRIHARI K.Mixed integer formulation to minimize makespan in a flow shop with batch processing machines[J].Mathematical and Computer Modelling,2004,40 (13):1465-1472.
  • 6LIAO C J,LIAO Limar.Improved MILP models for two-machine flowshop with batch processing machines[J].Mathematical and Computer Modelling,2008,48(7/8):1254-1264.
  • 7TANG Lixin,LIU Peng.Minimizing makespan in a two-machine flowshop scheduling with batching and release time[J].Mathematical and Computer Modelling,2009,49 (5/6):1071-1077.
  • 8AHMADI J H,AHMADI R H,DASU S,et al.Batching and scheduling jobs on batch and discrete processors[J].Operations Research,1992,40(4):750-763.
  • 9TANG L,LIU P.Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration[J].Applied Mathematical Modelling,2009,33(2):1187-1199.
  • 10GUPTA A K,SIVAKUMAR A I.Optimization of due-date objectives in scheduling semiconductor batch manufacturing[J].International Journal of Machine Tools and Manufacture,2006,46(12):1671-1679.

引证文献10

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部