摘要
对锚杆静压桩施工过程中产生的附加沉降进行了定义,分析了附加沉降产生的原因,并提出了相应的治理措施。
Additional settlement in the process of construction with anchoring pressure piles is defined in this paper. In addition,the mechanism of additional settlement is analysized. At the same time, this paper provides some useful methods to prevent and avoid the damage caused by additional settlement.
出处
《工业建筑》
CSCD
北大核心
2000年第1期31-33,50,共4页
Industrial Construction
关键词
附加沉降
锚杆静压桩
预钻孔
施工
additional settlement anchoring pressure pile prebored hole