上构梁板的预制是制约桥梁施工进度的关键,通过梁板预制场综合设计方案的比选确定的建设方案,保证了在降低施工成本的前提下梁板预制的进度,保证了桥梁施工的总体工期。
The precasting of beam and slab for upper structure is the key of influencing bridge construction progress. Construction scheme determined through comparision and selection of comprehensive design scheme for precast yard of beam and slab could ensure the precasting schedule of beam and slab with the premise of reducing construction cost, so that the overall construction period for bridge is guaranteed.