摘要
介绍了薄壁钢筋混凝土水塔的拆除过程和在施工过程中遇到的问题,通过严格管理、科学施工,水塔最终按照预定的正西方向倒塌。为以后同类工程提供参考。
The demolition process of thin-wall reinforced concrete water tower and the problems encoun tered during its blasting demolition construction progress were introduced. By means of strict management and scientific construction, the water towers was eventually collapsed in accordance with the predetermined direction(due west). All of which provided good references for the similar projects in future.
出处
《工程爆破》
北大核心
2011年第4期82-83,30,共3页
Engineering Blasting
关键词
薄壁
水塔
爆破拆除
Thin-wall
Water tower Blasting demolition