期刊文献+

基于模糊AHP-TOPSIS的远程跟踪技术决策研究

Decision Support of Remote Tracking Technologies on Construction Site Based on AHP TOPSIS
在线阅读 下载PDF
导出
摘要 新兴的远程跟踪技术可以在很大程度上提高传统的施工现场管理中手工操作数据的效率和效果。同时,这些技术的发展也为施工现场的信息化管理提供了极大的便利。但是,众多技术各有特点,在分析不同技术的属性和应用领域的基础上,建立了远程跟踪技术评价的指标体系,通过层次分析法确定各指标的相对权重,然后采用模糊TOPSIS对多种远程跟踪技术进行评价、整理、排序。直观的排序结果可以为决策者选择合适的远程跟踪技术提供决策支持。 The emerging remote tracking technologies can improve the efficiency and effectiveness of data management on construction sites to a large extent. The development of these technologies will facilitate the information management of construction sites. But these technologies have distinctive features and advantages. Based on the features and application, the evaluation index system of remote tracking technology is built. The relative weights of indexes are given by means of Analytic Hierarchy Process (AHP) . The various remote tracking technologies are evaluated and sorted by means of fuzzy TOPSIS. The visualized ordinal result can support the decisions on the selection of remote tracking technologies.
出处 《工程管理学报》 2011年第6期660-665,共6页 Journal of Engineering Management
基金 国家自然科学基金(51178084)
关键词 远程跟踪技术 层次分析法 模糊TOPSIS 决策支持 remote tracking technologies AHP Fuzzy topsis decision support
  • 相关文献

参考文献13

二级参考文献36

  • 1邱平,张荣成,袁海军.红外热像法和雷达法在工程质量检测中的应用[J].施工技术,2004,33(8):53-54. 被引量:2
  • 2张勇东,祁耀斌,陈逢春.光纤传感器及其在安全监测系统中的应用[J].电光与控制,2004,11(4):60-62. 被引量:7
  • 3Teemu Roos,Petri Myllym?ki,Henry Tirri,Pauli Misikangas,Juha Siev?nen.A Probabilistic Approach to WLAN User Location Estimation[J]. International Journal of Wireless Information Networks . 2002 (3)
  • 4Fontana R J,Richley E,Barney J.Commercialization of an ultra wideband precision asset location system. Pro-ceedings of2003IEEE Conference on Ultra Wideband Systems and Technologies . 2003
  • 5Paolo B,Prashant P,Vince W C,et al.Wireless sensor networks:A survey on the state of the art and the802.15.4ZigBee standards. Computer Communications . 2007
  • 6Jang W S,Skibniewski M J.Wireless network-based tracking and monitoring on project sites of construction materials. Proceedings of the9th International Confer-ence on Modern Building Materials,Structures and Tech-niques . 2007
  • 7Sidney M L.Project Management in Construction. . 2002
  • 8Ergen E,,Akinci B,Sacks R.Tracking and locating com-ponents in a precast storage yard utilizing radio frequency identification technology and GPS. Automation in Con-struction . 2007
  • 9Lu M,Chen W,Shen X S,et al.Positioning and tracking construction vehicles in high dense urban areas andbuilding construction sites. Automation in Construction . 2007
  • 10Lu M,Chen W,Chan W H.Discussion of‘building project model support for automated labor monitoring’by R.Sacks,R.Navon,and E.Goldschmidt. Journal of Computing in Civil Engineering . 2004

共引文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部