研究目的:既有铁路混凝土梁桥以中小跨度为主,理论与实践表明列车提速后,大多数梁体横向刚度不足,墩台截面偏小同样会刚度不够,不能满足提速的要求,为此需要对梁体及墩台进行加固改造。本文结合漯阜铁路既有线提速及改建设计,对既有铁路混凝土简支梁桥加固进行研究,总结了一些经验,有益于其它既有线铁路桥梁加固参考。研究结论:加强混凝土简支梁横隔板横向连接,可很好地抑制桥梁横向振动;梁底粘贴钢板、增设体外预应力钢束,可有效提高梁的承载能力;加大桥墩截面可大幅度增加横向刚度;采取以上措施加固的既有铁路混凝土简支梁桥能满足提速要求。
Research purposes: The existing railway concrete simply - supported beam bridge is mainly of medium and small span style. The theory and practice showed after the train speed - raise, the lateral stiffness of the most beam was not enough and the pier stiffness was not enough because the pier section was small. They could not meet the speed -raise requirement, so it was necessary to reinforce the beam and pier. For the upgrading plan of the Luohe - Fuyang Railway, the study was done on the reinforcing technology for the existing railway concrete simply - supported beam bridge and the the experience of it was summed up for offering the reference to the similar works.Research conclusions: Strengthening can well control the lateral vibration the transverse connection of the diaphragm of the concrete simple -supported beam of the bridge. Adding the beam bonding steel plates and the external prestressing steel strands can effectively increase the load - bearing capacity of the beam. Enlarging the cross section of the pier can greatly enhance the lateral rigidity of the piers. The existing railway concrete simply -supported beam bridge reinforced by taking the above measures can meet the soeed -raise reauirements.
出处
《铁道工程学报》
EI
北大核心
2011年第12期54-56,63,共4页
Journal of Railway Engineering Society
关键词
既有铁路
混凝土简支梁桥
加固
研究
existing railway
concrete simply - supported beam bridge
reinforcement
research