摘要
结合地铁十号线二期前期工作经验,并依据规划和设计部门提供的管线综合设计图,制定出实际可行的管线改移初步方案,邀请管线产权单位及设计单位对管线改移方案不断优化,尽可能避免二次改移,以保证地铁施工的顺利进行。
Combining with preliminary work of the subway line No.10 at phaseⅡ,according to comprehensive pipeline design chart provided by planning and design departments,preliminary feasible pipeline diversion scheme is formulated.Pipeline right unit and design unit are invited to continuously optimize pipeline diversion scheme so as to avoid second time diversion as much as possible,and to guarantee smooth subway construction.
出处
《山西建筑》
2012年第2期96-97,共2页
Shanxi Architecture
关键词
地铁
管线改移
处理方案
subway
pipeline diversion
processing scheme