泸定水电站深厚覆盖层防渗墙施工技术 被引量:6

Construction of Cut-off Wall in Deep Overburden for Luding Hydropower Station
在线阅读 下载PDF
导出
摘要 泸定水电站河床段覆盖层深厚,地质条件复杂,防渗墙设计深度最深段达110 m。整个施工过程采取了一系列新技术、新方法,包括泥浆固壁技术、接头孔技术、排渣管技术等,均达到国内领先水平。通过对施工成果的深入总结,初步形成了科学、具体、切实可行的深厚覆盖层防渗墙施工技术,可为类似工程提供参考和指导。 The overburden on the river channel in Luding Hydmpower Station is deep and the geological conditions are complex. The maximum depth of cut-off wall is designed up to 100 m. New technologies and methods for constructing the cut-off wall are adopted, including slurry-supported, hole-connector and spoil disposal technologies. They are advanced in China and consist of a scientific and practical construction system for cutoff wall in deep overburden. The construction of cut-off wall in Luding Dam is summarized herein and can be as references to similar projects.
出处 《水力发电》 北大核心 2012年第1期50-53,共4页 Water Power
关键词 深厚覆盖层 防渗墙 施工技术 泸定水电站 deep overburden cut-off wall construction technology Luding Hydropower Station
  • 相关文献

同被引文献80

引证文献6

二级引证文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部