清华5MW低温核供热站反应堆物理启动监督检查及其结论

SURVEILLANCE INSPECTION AND RESULT ON PHYSICAL START-UP FOR 5MW EXPERIMENTAL LOW TEMPERATURE DISTRICT HEATING STATION
在线阅读 下载PDF
导出
摘要 一、前言根据《中华人民共和国民用核设施监督管理条例》及其实施细则的规定,国家核安全局决定对清华5 MW低温核供热站试车、反应堆装料、临界、低功率试验和功率试验进行监督检查,并委托北京核安全审评中心组织检查组实施检查。我们参加了核供热站整个调试启动的监督检查工作。反应堆物理启动监督检查是其中一个检查项目。 Through the inspection on physical start-up of reactor, it is identified thatthe.data of critical extrapolation and transition and the implementation of safetylimit are correct. The results of inspection show that the physical start-up for 5MW NDHR is successful. The steady doubling time after critical transition is 237seconds, it is within the acceptance criteria 30--300 seconds. The nuclear instru-mentation systems which are.used for normal operation have response to the neu-tron.flux at this power level. The reactor power is below protection set-point.
出处 《原子能科学技术》 EI CAS CSCD 北大核心 1990年第6期85-87,67,共4页 Atomic Energy Science and Technology
关键词 供热堆 低温 临界外推 物理启动 Doubling time Critical lattice Critical extrapolation Reactivity
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部