摘要
在分析夏季高温对混凝土性能影响的基础上,结合武汉天兴洲公铁两用长江大桥正桥的夏季混凝土施工实际,提出夏季混凝土施工中和施工后混凝土温度的控制方法,确保混凝土的质量。
Based on analyzing the influence of the high temperature in summer on concrete performance,and connecting with the summer concrete construction of Wuhan's Tianxingzhou Bridge,the main bridge of Wuhan Changjiang River Railcum-Road Bridge,this paper puts forward some methods for controlling the concrete temparature in and after the concrete construction in summer.
出处
《科技情报开发与经济》
2011年第34期226-228,共3页
Sci-Tech Information Development & Economy