东沙特大斜拉桥下横梁支架施工模拟与分析计算 被引量:17

Construction Simulation and Analysis of Lower Support Beams Under Dongsha Long Span Cable-Stayed Bridge
原文传递
导出
摘要 以广州东沙特大桥为工程背景,主要介绍斜拉桥主塔下横梁支架施工方法与相关分析计算。同时应用有限元软件Algor对支架施工过程中受力结构或部位,如贝雷横梁、支撑钢管、塔身牛腿等,进行模拟分析与计算,用以验证支架施工的可行性,同时为支架施工的安全性提供技术保障。 Based on the construction of Dongsha Long Span Cable-Stayed Bridge, the construction method and related analysis of lower beams structure of this main tower are mainly described. And simulation and analysis of some stressed parts during the construction proccess,such as Bailey beams, steel pipe pile, supporting corbel and so on are made by finite elements software Algor. This can judge the feasibility of this construction method and make technical guarantee for its construction safety.
作者 卜骄
出处 《公路》 北大核心 2011年第12期75-80,共6页 Highway
关键词 斜拉桥 下横梁 施工模拟 Algor软件 cable-stayed bridge lower beam construction simulation Algor software
  • 相关文献

参考文献8

二级参考文献11

  • 1窦文俊,邵慧燕.石门大桥塔梁墩固结点设计研究[A].中国土木工程学会市政工程学会第三次全国城市桥梁学术会议论文集[C].1991.
  • 2李正仁,朱运河,段自力.珠海淇澳大桥斜拉桥的塔梁墩固结处三维应力分析及三维光弹试验[A].第九届结构工程学术会议论文集(第1卷)[C].2000.
  • 3JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
  • 4陆仁达.公路施工手册桥涵[M].北京:人民交通出版社,2000.
  • 5桂业昆,邱式中.桥梁施工专项技术手册[M].北京:人民交通出版社.2001.
  • 6王国周.钢结构-原理与设计[M].北京:北京清华大学出版社.2002.
  • 7JB 50205-2001,钢结构工程质量施工验收规范[S].
  • 8JB 50017-2003,钢结构设计规范[S].
  • 9武志军.塔梁固结体系斜拉桥下横梁预加力效应研究[J].世界桥梁,2008,36(1):50-52. 被引量:8
  • 10张宏武,汪成龙,马尚军,武娟,谭跃飞.株洲湘江四桥主桥基础及下部结构施工[J].公路与汽运,2008(5):117-118. 被引量:1

共引文献3729

同被引文献97

引证文献17

二级引证文献86

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部