期刊文献+

沈阳中心城区水源地漏斗恢复调蓄模拟研究 被引量:8

Numeric Simulation Research on the Recovery of Groundwater Funnel in Core Region of Shenyang City
在线阅读 下载PDF
导出
摘要 在沈阳市由于长期地下水超采严重,已经形成大面积地下漏斗空间,形成引发严重地质灾害的隐患。分析了沈阳市地下水漏斗可恢复性建设的水文地质条件。并结合数值模拟方法研究了沈阳市地下水漏斗区域水量恢复时间和地下水漏斗中心水位恢复程度。结果表明:在同时增加河流补给量和压缩地下水开采量条件下,2年以后地下水漏斗中心水位可达到31.67m;压缩地下水开采量或增加河流补给量,均可在4年恢复漏斗区地下水位,且沈阳城区可有效增加地下水资源量0.88×108m3。 The long-term over-exploitation of groundwater has caused large area groundwater funnel in Shenyang City,which may cause severe geological disasters.We analyzed the hydrogeological conditions of recoverability construction of Shenyang groundwater funnel.Moreover,numerical simulation method was used to study the recovery period and degree of groundwater funnel of Shenyang.The results show that in the condition of increasing rivers recharge and compressing groundwater amount for production,it will take about 2 years for groundwater table to reach about 31.67m;in the condition of ether increasing rivers recharge or compressing groundwater amount for production,it will take 4 years for groundwater table to recover and increase 0.88×108m3 of groundwater resources in Shenyang City.
出处 《水文》 CSCD 北大核心 2011年第5期47-51,共5页 Journal of China Hydrology
基金 国家自然科学基金(40501013)
关键词 数值模拟 水资源调蓄 地下水漏斗 沈阳市 numerical simulation water resources recovery and storage groundwater funnel Shenyang City
  • 相关文献

参考文献8

二级参考文献55

共引文献74

同被引文献123

引证文献8

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部