摘要
通过对卤水开采过程中盐结晶堵管及砂堵的成因进行分析与研究,提出相应对策,预防事故发生,保证井组安全平稳运行。
Through the analysis and study to the causes of the pipe plugging caused by salt crystal and sand during brine extraction,corresponding measures should be taken to prevent the occurrence of accident and safe and stable operation of the well groups are guaranteed.
出处
《中国井矿盐》
CAS
2011年第6期19-21,共3页
China Well and Rock Salt
关键词
饱和卤水
结晶
堵管
解堵
Saturation
crystallization
pipe plugging
plugging removal