期刊文献+

Optical Cable Telecommunication Networks

Optical Cable Telecommunication Networks
在线阅读 下载PDF
导出
摘要 1. Southern Coastal Optical Cable Engineering Project. The cable was completed and put into operation in 1992, and has a total length of 2,800km, starting from Nanjing in the north, via Shanghai, Hangzhou, Fuzhou, Xiamen, Huizhou, leading to Guangzhou in the south, covering Jiangsu, Shanghai, Zhejiang, Fujian and Guangdong. The whole line has
出处 《China's Foreign Trade》 1995年第8期32-33,共2页 中国对外贸易(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部